智能变电站帮助系统综合监控平台
技术规范(范本)运用说明
1.本技术规范分为通用部分、专用部分。
2.项目单位依据需求选择所需设备的技术规范,通用技术规范、专用技术规范固化的参数原则上
不能更改。
3.项目单位应按实际要求填写“项目需求部分”。如的确须要改动以下部分,项目单位应填写专用
技术规范“表6项目单位技术差异表”并加盖该网、省公司物资部(招投标管理中心)公章,与帮助说
明文件随招标支配一起提交至招标文件审查会:
1)改动通用技术规范、专用技术规范固化的参数;
2)项目单位要求值超出标准技术参数值;
3)须要修正污秽、温度、海拔、覆冰厚度、耐地震实力等条件。
经标书审查会同意后,对专用技术规范的修改形成“项目单位技术差异表”,放入专用技术规范中,
随招标文件同时发出并视为有效,否则将视为无差异。
4.对新建工程,项目单位应遵循通用技术规范部分的一次、二次及土建的接口要求。对扩建工程,
项目单位应在专用技术规范提出与原工程相适应的一次、二次及土建的接口要求。
5.技术规范的页面、标题、标准参数值等均为统一格式,不得随意更改。
6.投标人逐项响应专用技术规范中“1标准技术参数表”、“2项目需求部分”和“3投标人响应
部分”三部分相应内容。填写投标人响应部分,应严格按招标文件专用技术规范的“招标人要求值”一
栏填写相应的招标文件投标人响应部分的表格。投标人填写技术参数和性能要求响应表时,如有偏差除
填写“表7投标人技术偏差表”外,必要时应供应相应试验报告。
目次
智能变电站帮助系统综合监控平台技术规范(范本)运用说明··················································95
1总则·························································································································97
1.1一般规定················································································································97
1.2标准和规范··············································································································97
1.3投标人必需提交的技术参数和信息····················································································98
1.4安装、调试、性能试验、试运行和验收···············································································98
2技术要求···················································································································99
2.1环境条件················································································································99
2.2工作条件················································································································99
2.3基本技术条件···········································································································99
2.4技术性能要求·········
文档评论(0)