2015版福特Q1现场审核表Draft-EN-CHS-Q1-Site-Assessment-Evaluation-Matrix-Dec2015 (1).xlsVIP

2015版福特Q1现场审核表Draft-EN-CHS-Q1-Site-Assessment-Evaluation-Matrix-Dec2015 (1).xls

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Sheet1 Revision log GYR Summary Page Q1 Assessment Evaluation Matrix Acronyms Instructions Print_Area Print_Area Print_Area Print_Titles Q1 Site Assessment Evaluation Matrix 1) The Q1 Site Assessment Evaluation Matrix is a checklist used to provide objective evidence that satisfies the Q1 Site Expectations, see /sta/Q1.html. 2) Suppliers are required to provide the completed checklist to the responsible STA engineer upon request. 3) Suppliers are required to keep completed copies of the Q1 Site Assessment checklist, and accompanying corrective action plans, covering the prior 24 months. These copies are to be maintained at the supplier manufacturing location and available upon request from the responsible STA engineer. 4) Changes to this document are identified by: - Column A in the Site Assessment: Identifies a change in that row with an x - As identified in the Revision Log 5) The tier 1 supplier is responsible to ensure that all tiers of suppliers are assessed to the applicable Ford manufacturing process standards. Refer to /sta/Ford_GTS.html on Ford Supplier Portal for all these standards except CQI-xx , which are available through AIAG. 6) Score each sub-element with R/Y/G and the Expectation ranking will automatically be calculated. If you receive an INC in the Expectation ranking, one of the sub-elements was not scored. 7) The STA site engineer has the option to revise Expectation ratings, based on the site engineers knowledge of the supplier site. The Q1MSA is then returned to the supplier for appropriate update. 1PP (First Phase of Production Prove-Out - FPDS) AIAG (Automotive Industry Action Group) AIMS (Automated Issues Matrix System) APQP (Advanced Product and Quality Planning) AWS (Analytical Warranty System) BTS (Build-To-Schedule) CE (Cause and Effect) CAD/CAM (Computer-Aided Design/Computer-Aided Manufacturing) CC (Critical Characteristic) CP (Confirmation Prototype) Cpk (Process Capability Index) CPU (Cost Per Unit) CPV (Capacity Planning

文档评论(0)

152****3299 + 关注
实名认证
文档贡献者

四川省南充市人,在重庆汽车行业从事质量工程师一职

1亿VIP精品文档

相关文档