安盛咨询公司SAP系统实施过程[英文版].pptx

安盛咨询公司SAP系统实施过程[英文版].pptx

  1. 1、本文档共95页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SAP 系统实施 XXXX;目录;PP03 - Production Planning;;Planning levels;Product Groups;Product Group Structure;Text;Planning Data: Creating a Sales Plan;Generating a Production Plan;;;Transfer to Demand Management;Demo for SOP;;Planning levels;Logistics chain;Creating the demand program by entering planned independent requirements;;;;;Planning Strategies;Make-to-Stock Production;Make-to-Stock Production;Make-to-Order Production;Production by Lot Size;;Planning with Final Assembly;;Consumption Mode;Availability Check According to ATP Logic;;Planning without Final Assembly;Planning with Make-to-Order Production;Planning with Planning Material;Demo for Demand Management;;Master Production Scheduling;Single-level specification of dependent reqmts;Interactive Master Production Scheduling;;Planning levels;;Planning procedures;Materials planning procedures;;Carrying out the planning run;;Mehrstufige Einzelplanung Planung einer gesamten Stücklistenstruktur manuelle ?nderungen des Produktionsplanes für jedes Material in der Stückliste m?glich. Einstufige Einzelplanung manuelle ?nderung der Planung m?glich + Erfassen + L?schen + ?ndern + Umterminieren;;Multi-level planning structure;PLANUNGSLAUF;;;;;Scheduling;Scheduling for external procurement;Scheduling for in-house production;Backward scheduling for in-house production;Forward scheduling for in-house production;Lead time scheduling using the routing;;Processing the planning result;;Rescheduling checks;Pegging;Demo for MRP Run;;Business Background to Capacity Planning;Integration of Capacity Planning;;;Available capacity refers to the output of a capacity existing at a work center per working day Available capacity is determined by work start / finish times, breaks, the rate of capacity utilization and the number of individual capacities involved;;;;Working Hours to Productive Operating Time;;;;Scheduling;Lead Time of an Operation;;Example of a Standard Formula;Planning the Execution Time;Capacity Load Evaluation; ;Standard

文档评论(0)

文单招、专升本试卷定制 + 关注
官方认证
服务提供商

专注于研究生产单招、专升本试卷,可定制

版权声明书
用户编号:8005017062000015
认证主体莲池区远卓互联网技术工作室
IP属地河北
统一社会信用代码/组织机构代码
92130606MA0G1JGM00

1亿VIP精品文档

相关文档