- 1、本文档共89页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
WAREHOUSE MANAGEMENT for xxxx manufacturing units;INDEX;INDEX;Warehouse Management allows you to map your entire warehouse complex in detail to storage bin level. Not only do you gain an overview of the entire quantity of a material in the warehouse; you can also always determine exactly where a certain material currently is in your warehouse complex.
Today: our stock is known on material lot quantity level
Tomorrow: our stock will be known on material batch, quantity and location level
Main tasks in WM to be executed:
Raw material receipt
Unload pallets at goods receipt area
Move pallets to general storage area (2 scanning activities)
Picking for production
Collect after process order release the required material for production from the general storage area (1 scanning activity)
Place the material at the Production supply area (1 scanning activity)
Consumption of used material
Moving material from packaging area to the loading dock
Loading the truck
;Organizational Structure xxxx LE;Organizational Structure xxxx LE;Master data - Storage locations;Warehouse management Storage general definitions ;xxxx decisions warehouse management ;xxxx decisions warehouse management example;Production supply area, control cycles, consumption bins definitions ;Production supply area, control cycles, consumption bins definitions ;xxxx decisions psa control cycles and consumption bins ;xxxx decisions psa control cycles and consumption bins ;xxxx decisions psa control cycles and consumption bins ;Control cycle record general bin - material specific;Overview WM for manufacturing shop floor (EUR/APAC); IM, non-HUM (SLO) Storage Location (outside WM); IM, non-HUM (SLO) Storage Location (outside WM);Ground floor FCP ;2nd floor FCP ;4th floor FCP ; IM, non-HUM (SLO) Storage Location (outside WM);Main SAP transactional steps for staging;Main SAP transactional steps for staging;PO or STO inbound delivery create, packing, HU put-away, GR, Staging to production
;PP-PI
您可能关注的文档
- SAP系统概览培训_SD概述.pptx
- SAP学习资料文档KUM-MM-000组织结构.ppt
- SAP学习资料文档LE - SFS Nested Handling Unit Management.PPTX
- SAP学习资料文档LE Outputs – (re)Printing, Output from Shipments.PPTX
- SAP学习资料文档LE000 - Logistics Execution Fundamentals GC2.pptx
- SAP学习资料文档MRO简介.ppt
- SAP学习资料文档physical inventory in Warehouse management.PPTX
- SAP学习资料文档Physical inventory user guide22222.PPTX
- SAP学习资料文档PM 试运行方案-version 2.3.ppt
- SAP学习资料文档PM流程讨论.ppt
最近下载
- DB11T 383-2023 建筑工程施工现场安全资料管理规程.docx
- 2024-2025学年小学劳动三年级上册人教版《劳动教育》教学设计合集.docx
- 单位工伤事故认定公示情况反馈表(样表).doc
- 卫生监督法律法规和政策文件答案-2024年全国疾控系统“大学习”活动.docx VIP
- (心理咨询师习题集《案例分析》.doc VIP
- 《民航危险品运输》教学课件.docx VIP
- 拼多多新商家基础经营能力认证考试题库答案,平台规则+商品设置+客户服务+订单售后.docx
- 推动车辆互联的创新驱动车联网MNO智能物联卡平台解决方案.pptx
- 云平台解决方案酒店管理系统的完美选择.pptx
- GB50084-2017 自动喷水灭火系统设计规范.docx
文档评论(0)