- 1、本文档共83页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第六部分随钻测量技术 6.1 随钻测量信息系统概述 VSP - Checkshot(校验炮) While Drilling (4)Look Ahead/Below Sheet Anhydrite or Salt (5)Find Geosteer into Porous Carbonate Layers Embedded in Salt (6)Optimize Well Position in Oil Rim (7) Maximize Sand Penetration in Channelized Reservoir (8) Find Geosteer into Fractured Zones (9) Identify Delineate Compartments (11)Detect Fluid Contacts Remote from Well (12)Optimize In-fill Well Placement to Avoid Water Influx via Fractured Faults (13) Optimize In-fill Well Placement to Avoid Water Influx via Permeable Zones (14) Locate Remaining Oil Away from Watered Out Wells (15) Locate Remaining Oil in a Layered Reservoir (16) Locate OWC’s in Proximal Stacked Oil Bearing Sands (17) Monitor beyond a Vertical Production Cone (Water or Gas) (18) Monitor Water (Gas) Encroachment Sweep Efficiency from Horizontal Producer (19) Identify Bed Boundaries Faults Ahead of the Bit 6.7 Well Logging Trends Conveyance Independent Data Geosteering Behind Casing Reservoir Sensors (3) Optimize Geosteering Relative to Cap Rock OWC Horizontal Well GWC Salt or anhydrite OWC GOC Geopressured Sand (10)Detect Geopressures Ahead of the Bit GOC OWC OWC Higher k POWC POWC POWC POWC Horizontal Well Original OWC POWC Original OWC Horizontal Well Original OWC Current OWC Original OWC Current OWC Horizontal Well Integrated Drilling Evaluation and Logging(IDEAL) ——GeoSteering Tool 地质导向的特性: 电阻率和咖码测井可确定被钻岩层的流体和岩石性质; 方位电阻率提示司钻钻遇新的地层(approaching formation boundaries and contacts),以便确定最佳工具面角; Bit speed enables the driller to optimize the power curve of the motor and improve penetration rate; Inclination at the bit enables the directional driller to drill straight ahead, reducing well tortuosity and extending the potential dispalce-ment of the well bore.
您可能关注的文档
最近下载
- 《信息技术应用创新软件适配改造成本评估规范》.pdf
- 中国行业标准 YY/T 1939-2024医疗器械细菌内毒素试验方法 重组C因子法.pdf
- 各类游资炒股心法及感悟,套利模式.pdf
- 【客户管理】龙湖客户细分及工作模式分享精华篇-102p.pptx
- 学校智慧平台管理制度范文.docx VIP
- ASME中国制造-ISO12944-5-2018 中文译稿 第5部分 防护涂料体系.pdf
- 《诫子书》公开课课件(共24张ppt)部编版语文七年级上册.ppt
- 三年级数学下册期中试卷及答案【可打印】.doc
- 关于《佛山市市级财政资金投资建设项目工程概算预算结算.doc
- 二年级上册语文选择题强化练习(一).docx
文档评论(0)