通道压裂:致密气增产模式的转变.pptx

通道压裂:致密气增产模式的转变.pptx

  1. 1、本文档共24页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Channel Fracturing:A Paradigm Shift in Tight Gas StimulationInnovationfor a Step-Changein Conductivity HiWAY Incrementalimprovements in: ? Fluid technology (gel loading, polymer-free) ? Proppants (size,mesh, strength) ? Breaker(oxidizer,encapsulated,enzymes)FractureConductivityTheoretical 2010-2011 maximum1947ChannelFracturing TechniqueChannelfracturingChannelfracturingThe channel fracturing technique engineersstable flow channels into the proppant packenabling infinite flow capacity…Hydrocarbonnow flows through the channelsformed, rather than through a homogenousproppantpack..Providessuperiorwellperformance:????Significantly higher fracture conductivityImproved fracture clean-upLonger effective fracture half lengthsLowerpressuredrop along the fracChannelfracturingChannelfracturingHiWAY is Applicable in a Broad Range of Reservoirs? Oil,condensate-richandgaswells? Competentrock –Sandstone/carbonate/shale(E/sMIN 275)? Requiresthe use ofviscousfluids? Casedhole,openhole,verticalandhorizontalwells? BHST 345 oF ( 174+ oC)Designand Execution? Engineeredcandidateselection? Designvia FracCADE*HiWAY module? Thoroughpeer reviews anddesigncertification? Optimizedprocess controlusingSLB standardfracturingequipment8Designand Execution? Engineeredcandidateselection? Designvia FracCADE*HiWAY module? Thoroughpeer reviews anddesigncertification? Optimizedprocess controlusingSLB standardfracturingequipment9Designand Execution? Engineeredcandidateselection? Designvia FracCADE*HiWAY module? Thoroughpeer reviews anddesigncertification? Optimizedprocess controlusingSLB standardfracturingequipment10Job Execution – From ConceptTo Reality Schematicpump schedule Conventional HiWAY Pad TimeSand ConcentrationCleanFluid(clean)pulseProppant(dirty) pulseCycleTail-instageJob Execution – From ConceptTo Reality Actualpump schedulein typical HiWAY job600480360240120 0543210Sand Concentration, kg added/m3Sand Concentration, PPA11:39:4311:46:2311:53:0311:59:43HiWAY:Extensive Worldwide Experience10,000

您可能关注的文档

文档评论(0)

Jermain2014 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档