- 1、本文档共210页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
精致模板:工具图库(强力推荐!)
Roland Berger Strategy Consultants Module und Variations_E Contents Page A. Standard slides 3 B. Lists (1) – Factors, no specific number 7 C. Lists (2) – Factors, specific number 13 D. Matrix – Factors, comparisons 24 E. Process (1) – Factors, steps 35 F. Process (2) – Factors, impact 49 G. Process (3) – Factors, interlinked 67 Annex: Nine key changes compared to the old standards 73 Organizational chart Organizational chart (including headcount) Lists – horizontal (variations) Lists – vertical (variations) Schedule Sets of guidelines Pyramid (3 or 4 levels) Pyramid (5 levels/centered) 3 factors (interwoven) Common ground 4 factors (1) 4 factors (2) 4 factors (3) 4 factors (3a – weighted) 4 factors (3b – dynamic) 6 factors (variation) Matrix/table (Horizontal/vertical comparison of data – variations) Special types of matrix – opportunities/threats Special types of matrix – pros and cons Special types of matrix – controversy Special types of matrix – conflict/tension (1) Special types of matrix – conflict/tension (2) Special types of matrix – bottom up/top down (1) Special types of matrix – bottom up/top down (2) Special types of matrix – imbalance Processes Cycles (2) Hurdles Resistance/obstacles Nodes/interfaces Pressure Increase/decrease Various types of brackets (to be used instead of block arrows) Consequences (1) Consequences (1a) Consequences (2) Consequences (3) Consequences (4) Impact (4 and 6 factors) Impact (4 factors) Impact (5 factors) Impact (6 factors) Impact (8 factors) Impact and result (1) Impact and result (2) Vision Action/reaction Value chain Action/reaction (1) Action/reaction (2) (transparent – color presentation) Interaction Jigsaw puzzle 内外分析是为了建立双方对公司理解的共识,为项目的下一步发展奠定基础 战略模块的重点是培养**自己的能力,并在明确核心能力的前提下,明确将来的发展方向 组织结构和关键流程的设计是为了更好地实现公司战略,明确做事的职责和程序,提高效率 设计新的薪酬体系,做到公司有承受力,市场上有竞争力,员工中有吸引力 ××认为整个项目期限为3个多月(1) ××认为整个项目期限为3个多月(2) Action/reaction Action/reaction Against the tide/with the tide Bar chart Chances/risks Change of direction China
文档评论(0)