Method Statement for Excavation at Rock Quarry(revised).doc

Method Statement for Excavation at Rock Quarry(revised).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Method Statement for Excavation at Rock Quarry(revised)

Method Statement for Excavation at Rock Quarry 1. Introduction of Construction 1.1. Introduction of Construction Quarry is located at the right bank of Bung River and is 7km from dam, with a reserve of 1,980,000m3 and quantity of exploitation is about 1,450,000 m3. 1.2 Geological Conditions Burden layer of quarry is mainly primitive forest and diameter of tree is 10-30cm and the trees are about 5-10m high. Average thickness of soil layer is 7.6m and the quantity is about 525,000m3. The rock exploited is granite with an average thickness of 30m. 1.3 Construction quantity Construction Quantity of Quarry No Item Unit Quantity Remarks 1 Earth Excavation m3 525000 2 Rock Excavation m3 1455000 2. Layout of Construction 2.1. Layout of Construction Road 2.1.1 The Road Connect with Quarry D18 road: A Zigzag road from certain point of 14D national road will be built, leading to rock storage, workshop of crushed stone and quarry at EL321.00m. Foundation is 8m wide and surface is made of crushed stone and 7m wide. Gradient is controlled within 11%. It is mainly used as construction road outside the excavation scope. 2.1.2 The Road within the Quarry R1 road: It is connected to D18 road and built to EL370.0m from EL321.0m in Zigzag line, as a construction road within excavation scope. Foundation of Zigzag road is 6.5m wide and the surface is made of crushed stone and 6m wide. Gradient is controlled within 10%. Construction road for excavation of layering will be built to working face from corresponding elevation of Zigzag road, along contour line. Its foundation is 4.5m wide and the surface is made of crushed stone and is 4m wide. R2 road: It is connected to R1 road and from EL321.0m in Zigzag line, as a construction road for EL.334~EL.322 excavation. R2 road will be rebuilt as main road of EL.322~EL.310 excavation after finished excavation above EL322. Foundation of Zigzag road is 6.5m wide and the surface is made of crushed stone and 6m wide. Gradient is contr

文档评论(0)

yurixiang1314 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档