紧邻地铁隧道群基坑先浅后深施工技术.docx

紧邻地铁隧道群基坑先浅后深施工技术.docx

  1. 1、本文档共4页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
紧邻地铁隧道群基坑先浅后深施工技术

紧邻地铁隧道群基坑先浅后深施工技术张学伟,夏志锋,李学虎,鲍铭( 上海建工一建集团有限公司,上海 200120)[摘要] 针对紧邻地铁隧道区间群深基坑中三坑相连、深坑居中且先浅后深的非常规开挖工况进行研究。提出 4个施工措施保证此开挖工况基坑的安全可控: 在深基坑地下连续墙周边增设观测井监控地下连续墙的止水效果, 并作应急抽水之用; 沿地铁隧道区间成排设置回灌井作为地铁隧道保护措施; 在深基坑靠近住宅一侧设置回灌井 保护房屋结构; 对浅基坑已完成底板以下与深基坑共地下连续墙可能出现的渗漏,拟采用在坑外结构楼板加固区、 底板上预留上下贯通排孔,阿特拉斯注浆机钻杆通过排孔直接插入底板下土体成孔注浆的方法,保证基坑内外水 土的平衡稳定。[关键词] 基坑; 隧道; 注浆; 施工技术[中图分类号] TU753[文献标识码] A[文章编号]1002-8498( 2014) 21-0063-04Construction Technology of Shallow to DeepFoundation Excavation Close to the Subway TunnelZhang Xuewei,Xia Zhifeng,Li Xuehu,Bao Ming( Shanghai Construction No. 1 ( Group) Co. ,Ltd. ,Shanghai 200120,China)Abstract: The content of this article aimed at proposing methods against the interval group in deepfoundation excavation close to subway tunnel which are connected three excavation and the excavation of irregular condition in center that are first light after deep. At the same time,there are four protective measures in order to keep the security excavation and controllable conditions of the foundation excavation: firstly putting up an additional observation wells outside the excavation in order to observe sealing effect of the retention wall; secondly setting up arranged in a row along the intervals of subway tunnel as the protection measures of subway tunnel; thirdly setting up recharge wells near the residential side to protect the housing structure; at last for the diaphragm wall leakage under the shallow graves has completed the backplane board,more methods are used in order to ensure that confined water in and outside foundation excavation are balanced and steady like outside structure of floor,reserving linking up and down hole on the backplane board,Atlas note pulp drill rod directly inserting into geotechnical holes in the backplane to note syrup.Key words: foundation excavation; tunnels; grouting; construction工程概况长宁来福士广场位于长宁路凯旋路,与长宁龙 之梦购物中心对角相望,基坑 面 积 为 36 000m2 ,分 为 13 个坑,地铁 2 号线隧道区间从场地内南北向穿 过( 地铁距基坑最近仅 10m) ,将整个基坑分成东西2 个区,西区为 I ~ IV 坑,

文档评论(0)

pangzilva + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档