MICROPILE UPLIFT LOAD TEST METHOD (MICROPILE隆起负载测试方法).pdf

MICROPILE UPLIFT LOAD TEST METHOD (MICROPILE隆起负载测试方法).pdf

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MICROPILE UPLIFT LOAD TEST METHOD (MICROPILE隆起负载测试方法)

Micropile Uplift Load Test Method Statement GEOPROFOUND ENGINEERING SDN BHD MICROPILE UPLIFT LOAD TEST METHOD STATEMENT Objective : To Test Skin Friction Only a) The test pile is constructed to protrude above the ground level approximately 300mm with permanent casing installed. b) Prior to grouting the pile, 6-8 Nos of 0.6” anchor strands are embedded and tied to the last reinforcement cage of the pile at the top. The embedment or lap length of these anchor cables depend on the test load as per the drawing. c) Grout the micropile and leave for at least 7-days for grout to be sufficiently hardened. d) Assemble the reaction frame system as shown in Diagram 1. The anchor cable shall be locked into an anchor block (head) on the I-beam. Tie-rods and stiffener plates installed will stabilize the system. e) A sewer jack (multi-strand) hydraulic jack is placed atop the I-beam, which will pull all anchor strand when stressed. f) A calibrated load cell reacting against the hydraulic jack and the anchor block is placed with the use of centralizer blocks if necessary. g) Fix four (4) nos. dial gauges on an independent ‘pipe frame’ to measure the pile head displacement. h) All testing equipment shall be protected from unnecessary disturbance prior to and throughout the load test. i) The loading sequence shall follow the client’s specification including the step and duration. j) Records shall be kept promptly throughout the testing period. A copy shall be extended to the Superintending Officer at the end of the test. WWW.GEOPROFOUND.COM Micropile Uplift Load Test Method Statement GEOPROFOUND ENGINEERING SDN BHD Diagram 1 – Section view of Uplift Test Setup using two reaction piles and a se

您可能关注的文档

文档评论(0)

wnqwwy20 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:7014141164000003

1亿VIP精品文档

相关文档