- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
grc施工工艺(国外英语资料)
grc施工工艺(国外英语资料)
Construction plan of GRC outer decoration component
1. project overview, the biggest feature of the building for the typical European style design, European style villa atmosphere strong. And this style relies mainly on the installation of a large number of GRC European style components (glass fiber reinforced cement products) to reflect. According to statistics, accounting for 15% of the total decorative area of the exterior wall, the product and installation quality of the component directly affect the embodiment of the architectural style of the project. The 2. process of construction preparation - component inspection and approach of iron making to identify and support external reference line, according to the civil GRC component, GRC component specifications positioning line installation, repair, maintenance, caulking, partial acceptance. 3. construction method 3.1 component approach test standards, because the components are machined outside and prefabricated, so the quality of the approach components must be guaranteed. According to the standard of component manufacturing enterprise, field inspection shall be carried out according to appearance and size deviation. And enter the component must have the appearance qualification certificate, forbid to use the unqualified component. 3.2 component mounting and fixing method 1) line class installation a. When the section size is less than 800mm * 800mm, directly in the red brick or concrete wall with 8 x 100 expansion bolts and welding components (fixed and embedded parts embedded expansion bolt welding point of not less than 4). B. When the line section size is larger than 800mm * 800mm, in line with eaves angle bracket is fixed on the wall, and then on a wall in the expansion bolt and embedded parts welded components. (if the component is of backfill type) C. Special note: when the wall is light masonry, with 8 steel production and welding rod fixed wall component embedded parts. 2) window sleeve
您可能关注的文档
- 2015《心理、行为与文化》期末考试 尔雅 最新(国外英语资料).doc
- 2016 尔雅 超星 纷争的年代(国外英语资料).doc
- 2012株洲中考语文试卷含名师解析及答案(国外英语资料).doc
- 20世纪人力资源管理经典理论(国外英语资料).doc
- 2015年高考作文素材:课 外名句集锦(国外英语资料).doc
- 20余名员工管理突然集体被辞并领白条(国外英语资料).doc
- 20岁联想深呼吸 被多元化征服不做大事不行(国外英语资料).doc
- 20年后回眸:苏联解体证明了什么(国外英语资料).doc
- 21.141条生活中的基本常识(国外英语资料).doc
- 22条商规765人生论坛(国外英语资料).doc
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)