- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
水泥考题(全国公路水运工程检测人员继承教导2014)(国外英文资料)
水泥考题(全国公路水运工程检测人员继续教育2014)(国外英文资料)
Cement (the highway continues education)
1 topic cement standard consistency water test environment condition is: temperature ℃, humidity %.
A, 20 + 2, 50
Second question 2, the temperature and humidity range of standard curing box is: temperature ℃, humidity %.
B, 20 + / - 1, 90 or more
Question 3 qualifieds condition is that the pointer to the root hang 300 t, increases the distance between two hands should be within the scope of the mm, remove after farmar, to restore to the front of the suspension weights, the distance between the needle position.
D, 17.5 2.5 mm
When the cement slurry mix is made, we should wet the mixing pan with the wet cloth first, then add it in 5-10s.
A, the water that USES water of the standard consistency, 500g cement
The cement standard consistency of the cement standard refers to the cement slurry of the standard vicar test bar to the depth of the mm.
C, floor 6 + 1
The first measurement of the initial period of time 6 is 30min, which is measured once every other time in the early clotting time. When the time of the final coagulation time is measured at intervals.
C, 5, 15
Problem 7: when the cement and stability are boiling, the reelers clamp should be placed in the boiling box, and the direction of the needle is:
B, up
The water level in the boiling box should ensure that no water can be added during the whole boiling process, and it can also be guaranteed to boil.
D, 30 min + / - 5 min.
Problem 9 indoor temperature humidity record at least once a day at least once, the curing oven temperature record at least once. (a)
C, 4 h
The test of the cement fine scale (sieve analysis method), the negative pressure area of the sieve is Pa, and the sieve of negative pressure sieve is mu m.
D, 4000-6000, 4000
Problem 11 cement sample from sample to test to keep h. The cement sample should be sieving through the mm square.
B, 24,0.9
The test method of cement sand strength test is divided into benchmark method a
文档评论(0)