悬索桥施工平安操纵要点(国外英文资料).doc

悬索桥施工平安操纵要点(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
悬索桥施工平安操纵要点(国外英文资料)

悬索桥施工安全控制要点(国外英文资料) The diameter and the circumference of the main cable are measured separately using the special measuring device. 6.8.8, the main cable thread construction safety points: 1, the tie wire order The threads are interlaced and then interlaced. The edge span is carried out by the anchor to the sotta direction, which is carried out across the direction of the sotta. 2, main cable tie wire 1) the silk wheel is wrapped around the wire S shaped steel wire according to the interval between each cable clip precise dosage of steel wire and to supply volume, through the special wire machine in front of the shoulders with a certain tension will s-shaped wire coil turns around to store wire wheel, for main cable clip interval corresponding tie wire. Be aware of the safety in the process. 2) the spinning machine is in operation Install the thread machine on the top side of the tower, and install maintenance and debugging. In each speed reducer, the gearbox is filled with lubricating oil, and all other sports and other sports are required to add lubricating oil or grease. Perform the operation of the empty machine according to the requirement, and do all the preparation before the test. Adjust the turning of the thread ring and the forward motion of the current to the frequency converter, make the tooth ring each turn a circle (that is, the thread 1 ring) while along the frame to walk 9mm. 3) the wrapping test The wire thread test is carried out, the main test of the thread machine performance and welding strength, and confirm the following criteria: There is no gap between the wires. No overlapping winding, cross entanglement; The surface is smooth; The welding strength of the solder is to ensure that the shear strength is above the tension wire. Safety issues should be noted during the construction of the main cable. By strapping machine for main cable tie silk, major construction technology include: cable clip before the start of artificial extrusion tie wire

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档