大工13春《土木工程概论》在线测试3(国外英文资料).doc

大工13春《土木工程概论》在线测试3(国外英文资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工13春《土木工程概论》在线测试3(国外英文资料)

大工13春《土木工程概论》在线测试3(国外英文资料) 13 spring introduction to civil engineering online test 3 1. At room temperature, using the appropriate materials cover concrete, wet, dry wind prevention, heat preservation and take water anti-freezing measures such as conducted by the maintenance is (). A. hot curing Standard curing C. cold curing Natural curing 4 points: 4 According to soil (), soil can be divided into water and water. Apparent density The water absorption of B. Coefficient of penetration Relative density 4 points: 4 The following is a statement about the double codename network graph, and the error is (). A. arrow is for work Usually the work name is written on the top (or left) of the arrow. C. write the duration of the work under the arrow (or on the right) D. In the network diagram, a connection with a double arrow is allowed 4 points: 4 The vertical slope of the unsupported structure is not more than () in the solid and medium-thick sand and gravel soil. A. 1.00 B. 1.25 C. 1.50 D. 2.00 A full score: 4 The height is 5m, the horizontal projection width is 3m, and the slope coefficient of the slope is (). A. 0.6 B. 1.67 C. 0.8 D. 1.25 A full score: 4 The concrete shall be cast before (before) from the stirring site to the pouring site. A. the false setting B. initial setting C. final set D. hardening 4 points: 4 In the classification of soil engineering, the solidity coefficient is 0.5 ~ 0.6, which is also called (). A. the soft soil B. common soil C. hard soil D. the gravel A full score: 4 The ratio of concrete to the quality of various materials, or the proportion of materials used in concrete. A. per liter B. a tonne Per cubic meter D. can 4 points: 4 The following statement on the pile foundation is wrong (). A. load capacity The aseismic performance is good Small settlement D. Is a shallow foundation 4 points: 4 In the following network plan, it is () that the time expression of the network plan is divided into (). A. unit engineering network plan B. the control

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档