土木工程施工屋架吊装(国外英文资料).doc

土木工程施工屋架吊装(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
土木工程施工屋架吊装(国外英文资料)

土木工程施工屋架吊装(国外英文资料) Tongling college course design commitments Class name: single layer industrial plant structure suspension Department: civil architecture Last name: xie jihong Study no. 0811111148 Advisor: teacher liu baiguo Next time: November 2010 First, the general situation of the project This project for a single-layer reinforced concrete precast plant workshop, the workshop, a total of three spans (i.e., 12 meters, 18 meters, 24 meters), its axis plane position, plant size and profile of the design plan descriptions of the course. The determination of the structure lifting scheme The hoisting of the member of the building adopts the partial lifting method, which is convenient for the construction of the components, and the loading is not overcrowding. The crane runs three times: the first time the CDB, the hoisting column; For the second time, the beams of the cranes, the beams of the cranes, and the upright frame of the roof, and the roof is in place; The third CDB, hoisting roof, roof panel, skylight frame and roof support etc. The selection of crane and calculation of working parameters According to the existing equipment of the site, choose the crawler crane for structural lifting. Some of the work parameters of the main component lifting are: (1) the pillars The most important pillars are: Q = 6.9 t column is 11.8 meters long. Lifting weights: Q = Q + Q = 6.9 + 0.2 = 7.1 t. The lifting height required is shown in figure 1 H = H + H + H + H = 0 + 11.8 + 0.3 + 1.5 = 13.6 m Figure 1 (2) the roof. The calculation of the heaviest prestressed arch frame ygj-24; Weight: Q = Q + Q = 7.15 + 0.3 = 7.45 t. The lifting height required is shown in figure 2 H = H + H + H + H = (10.7 + 0.2) + 0.3 + 3.2 + 3 = 17.4 m Figure 2 According to the above data, the w-100 crawler crane with 23m arm length, The hoisting radius of the crane is determined by the cranes performance chart For R = 7m, the hoisting height H = 20.7 m 17.4 m satisfies the requirement. (3) roof boards.

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档