MDT Tube Assembly Manual.pdf

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MDT Tube Assembly Manual

MDT Tube Assembly Manual The ATLAS MDT Group IHEP, Beijing May 20, 2003 Abstract This manual describes the facilities and procedures of the ATLAS monitored drift tube assembly at the Institute of High Energy Physics, Beijing. It also includes the endplug assembly procedure and the measurement of tube length and wire tension. Contents 1 Introduction 2 Tube Assembly Facilities 3 Daily Routine Check 4 Tube Assembly Procedure Appendix: Endplug Assembly Procedure 1 Introduction The ATLAS group at the Institute of High Energy Physics (IHEP), the Chinese Academy of Sciences, will construct 48 Monitored Drift Tube (MDT) chambers in the next two years. These chambers are categorized as two different types, BEE and BIS.8, with 32 and 16 chambers respectively. The total number of tubes to be constructed is about 7000, which requires that the tube production rate should reach 50 tubes per day. The assembled tubes must meet high quality specifications, as summarized in table 1. Item Specification Test method Tube length ??L?≤250μm Indicator Wire position ?X25μm EMMI system Wire tension 350g±15g Measurement of fundamental vibration model Gas leak rate 10-8bar?l/sec Helium leak detector Dark current 2nA DAQ-card Table 1. Quality control specifications for MDT tubes The task of tube assembly is to insert the endplug precisely into its position with high quality swaging between tube and endplug, and tension the wire to desired specification. All of the procedures are within the wiring room, part of the clean room that satisfies the following specifications: ?clean class better than 10,000 ?temperature 20OC±1OC ?relative humidity 45%±10% 2 Tube assembly facilities The tube assembly station (fig.1) mainly consists of following facilities: Fig.1 Wiring station Fig.2 Eastern (left) and western (right) sides of the wiring station ?Vacuum chucks/endplug holders/swaging coils Two vacuum chucks which hold the tube during tube w

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档