- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
MDT Tube Assembly Manual
MDT Tube Assembly Manual
The ATLAS MDT Group
IHEP, Beijing
May 20, 2003
Abstract
This manual describes the facilities and procedures of the
ATLAS monitored drift tube assembly at the Institute of High
Energy Physics, Beijing. It also includes the endplug assembly
procedure and the measurement of tube length and wire tension.
Contents
1 Introduction
2 Tube Assembly Facilities
3 Daily Routine Check
4 Tube Assembly Procedure
Appendix: Endplug Assembly Procedure
1 Introduction
The ATLAS group at the Institute of High Energy Physics (IHEP), the Chinese Academy of
Sciences, will construct 48 Monitored Drift Tube (MDT) chambers in the next two years.
These chambers are categorized as two different types, BEE and BIS.8, with 32 and 16
chambers respectively. The total number of tubes to be constructed is about 7000, which
requires that the tube production rate should reach 50 tubes per day. The assembled
tubes must meet high quality specifications, as summarized in table 1.
Item Specification Test method
Tube length ??L?≤250μm Indicator
Wire position ?X25μm EMMI system
Wire tension 350g±15g Measurement of
fundamental vibration model
Gas leak rate 10-8bar?l/sec Helium leak detector
Dark current 2nA DAQ-card
Table 1. Quality control specifications for MDT tubes
The task of tube assembly is to insert the endplug precisely into its position with high
quality swaging between tube and endplug, and tension the wire to desired specification.
All of the procedures are within the wiring room, part of the clean room that satisfies
the following specifications:
?clean class better than 10,000
?temperature 20OC±1OC
?relative humidity 45%±10%
2 Tube assembly facilities
The tube assembly station (fig.1) mainly consists of following facilities:
Fig.1 Wiring station
Fig.2 Eastern (left) and western (right) sides of the wiring station
?Vacuum chucks/endplug holders/swaging coils
Two vacuum chucks which hold the tube during tube w
您可能关注的文档
- LOTIS Upper Limits and the Prompt OT from GRB 990123.pdf
- Lotus Domino Designer 8.5常用代码.docx
- LOUD A 1020-NODE MICROPHONE ARRAY AND ACOUSTIC.pdf
- LOUD A 1020-node modular microphone array and beamformer for intelligent computing spaces.pdf
- loud music 练习.doc
- Loud musicmakes me tense.doc
- Loud_music_makes_me_tense1.ppt
- Lovely Professional University.pdf
- Low rank representation.pdf
- Low temperature specific heat of glasses a non-extensive approach.pdf
- 商务英语智慧树知到答案2024年武汉城市职业学院.docx
- 身体的奇迹:人体生理探秘(山东联盟)智慧树知到答案2024年山东第一医科大学.docx
- 无机化学与化学分析(山东联盟)智慧树知到答案2024年山东航空学院.docx
- 游美国,学英语智慧树知到答案2024年山东建筑大学.docx
- 统计学智慧树知到答案2024年湖北工程学院.docx
- Visio商业图表制作分析智慧树知到答案2024年上海商学院.docx
- 高级语言程序设计(c)智慧树知到答案2024年陕西理工大学.docx
- 物理化学智慧树知到答案2024年广东工业大学.docx
- 医用高等数学智慧树知到答案2024年哈尔滨医科大学大庆校区.docx
- 大学基础物理实验智慧树知到答案2024年南开大学.docx
文档评论(0)