All Shanghai New Subway Lines.pptx

  1. 1、本文档共32页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
All Shanghai New Subway Lines

All Shanghai New Subway LinesPost A Group 5Steven Echo Lucy SueGeneral introduction1.1 Subway network total mileageShanghai 567km (L12L16 Included )New York 443kmLondon 408km1.2 RidershipShanghai 7000000 average daily(2013)New York4500000 average daily(2010)London 3000000 average daily(2009)Shanghai’s Metro1. Well-signposted3.Facilities4.Extremely crowded during rush hours5.Cosplay show!Line 12Primary stage(in trial operation)From Jinhai Road to Tiantong RoadLength: 19kmNumber of stations: 15Transfer station: to Line 10 at Tiantong RoadLine 12Secondary stage(under construction)From Qishen Road to Tiantong RoadLength: 21kmNumber of stations: 17Accesible time: between 2015 and 2017Large transfer stations: to Line 1 or 10 at S Shanxi Road to Line 2 or 13 at W Njing RoadLine 13From Jinyun Road to Zhangjiang RoadLength: 33.6kmNumber of stations: 31Availability: Jinyun Road to W Nanjing Road (in service)W Nanjing Road to Zhangjiang Road(2015)Large transfer stations: to Line 2 or 12 at W NJ RLine 14From Fengbang to Jinsui RoadLength: 39kmNumber of stations: 31Planning and publicity: 2013.2 – 2013.3Starting construction from 2015 to 2016Line 15Qihua Road to Zizhu Science-based Industrial ParkLength: 40.1kmNumber of stations: 29Starting construction from 2015 – 2020 (estimated)Major line from north to south for west ShanghaiLine 16From Dishui Lake to Longyang RoadLength: 59kmNumber of stations: 12 (3 underground stations and 9 viaduct stations)Available time: Dishui Lake to Luoshan Road(2013.12.29)Luoshan Road to Longyang Road(2014)Line 17From Hongqiao Railway Station to Oriental LandLength: 35.3kmNumber of stations: 13 (7 underground stations and 6 viaduct stations)Starting construction from 2013 to 2016(connect with Kunshan and Suzhou in the future)Transfer station: to Line 2 at Hongqiao Railway StationLine 18From Changbei Road to Hangtou StationLength: 44.3kmNumber of stations: 30Starting construction from 2015 to 2020(estimated

文档评论(0)

l215322 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档