- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
eettechsurvey-adp(13页)
Enterprise eTIME Technology Survey v4.3.1
Return the completed Survey to your ADP Representative.
GUIDELINES FOR COMPLETING THE SURVEY:
The Enterprise eTIME V4 Technology Survey is designed to accurately assess an Enterprise eTIME system to determine what software, hardware, training and services are needed to meet an organization’s time and labor management system goals. The survey is organized into the following sections:
Section A General Account Information and Project Team
Section B System Configuration and Hardware and Operating Systems for Client Systems Information
Section C Remote Support
Section D Database Sizing Information
Section E Data Collection Terminals
Section F Enterprise eTIME Project Scope and Timing
Section G Current Time and Attendance Solution
Section H Survey Sign-off
Completion of this survey does not constitute an order to ADP for the Enterprise eTIME system or related products; however, no orders will be processed without a completed Technology Survey. ADP is not responsible for any errors that may arise from incomplete or incorrect information provided in this survey. Survey information will be considered valid for 90 days.
An electronic form of submission of this document is requested.
An electronic version of this document can be obtained from your ADP representative.
THE REQUIREMENTS STATED IN THIS DOCUMENT HAVE NOT BEEN FINALIZED AND ARE SUBJECT TO CHANGE.
Section A: General Account Information and Project Team
Date Prepared: January 5, 2017
Account Name: ?????
Co Code: ?????
Address: ?????
City, State, ZIP: ?????
Description of the Client’s business: ?????
ADP Sales Team Name Phone Number ADP Processing Region: ????? N/A ADP Sales Office: ????? N/A ADP District Manager: ????? ????? ADP Division Product Manager/Specialist: ????? ????? ADP Sales Manager: ????? ?????
Project Team Information
Client Team Name Phone Number Executive Sponsor ????? ????? Project Manager
您可能关注的文档
- draftcopy-amherstcollege(75页).doc
- draftguidancematerialoninstrumentspecifications(13页).doc
- draftstatementofworkanddeliveryschedule(39页).doc
- drafttechnicalmemorandum(53页).doc
- drafttermsofreference-worldbank(8页).doc
- drawingglossary-worldimages(8页).doc
- drawinglineinautocadstepbystepinstructions(8页).doc
- drawingraydiagramsforbi-concaveandbi-convexspherical(8页).doc
- driver’ssleepinessdetectionsystem-bgu(9页).doc
- drinkingwater-relatedstatutesjanuary2012(291页).doc
文档评论(0)